Two homes on large flat lot, being fully renovated, new roofs, new everything, completion estimated for July 30. Room for 1 attached ADU and 2 detached ADUs. The renovations of the two homes should be complete and signed off by the city by about July 30.Seller has submitted a permit application to turn the garage into an ADU.Seller has hired a civil engineer to split the property into 3 lots: 1 lot with the west house 1 lot with the east house including garage. Garage being turned into 1BR ADU. 1 or 2 vacant lots.This process takes 8-12 months and is not guaranteed. We have paid a $5,000.00 deposit to the engineer to get it started, and expect to submit that application to the city by Aug 1.$825,000 includes two fully renovated & permitted homes, but will not include building the ADU in the garage and will not include completing the lot split. It will include the ADU plans and permit application for the lot split process.
IV23222900
Residential - Single Family, Duplex, Multi-Family, 1 Story
3
2 Full
1954
San Bernardino
0.5129
Acres
Public
1
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...